Design

It began as a design

115

saved changes built the prototype, between 20 August and 14 September 2026

Before a line of the production app was written, the whole experience was designed and tested as a working prototype.

Mockup

Then a working mockup

16

designed pages: the wireframes, the interactive mobile mockup, the structure map and the design explorations

That work set the navigation, the screens, the card and colour system and the Te Taiao look that the finished app still follows.

First build

Built, tested, then replaced

The first plan was a New Zealand cloud host called Catalyst Cloud and a content system called Directus. Both were built, tested and then replaced when better options proved themselves.

53,092

lines were written into the Directus editing studio over six weeks, across 202 saved changes

  • 39,516lines removed in one change on 25 October, once Sanity had proved itself. Today none of that studio remains.

Hosting

Hosted in New Zealand

The app's servers and its backup database run in Amazon's Auckland region, so the backups of people's records are kept in New Zealand.

8

infrastructure blueprints describe every server, network and database, so the whole setup can be rebuilt the same way every time

  • 22automated workflows build, check, publish and watch the app

Content

Where the content is edited

Sanity is the content system the Manawaora team uses to edit the app's words and pages.

123

pieces of published content are live in it, including 8 heart conditions, 94 trusted resources and 9 sets of screen words

  • 13,338lines were written for Prismic on 19 October, and the same day all of them came out again when Sanity proved the better fit

Offline

Built local first

A person's own records live on their phone and work without a signal. A New Zealand hosted backup lets a person restore their kete after a new or lost phone.

19

dedicated test files check offline use, storage, backup and restore

Audits

Audited at every step

Every change runs through automated checks before it can reach anyone's phone.

5,049

automated checks passed on the final build at completion, with none failing. By 11 November that had grown to 5,414.

  • 636security scans looked for leaked secrets and checked the app's building blocks for known weaknesses
  • 1,174times the full check suite ran

1 November 2026

A full practice restore

11.6minutes

until the database was rebuilt and back online

7.2minutes

of changes were at risk, at most

Shipping

Live on phones

The first production release reached phones on 16 October.

22

successful production releases of the app by completion

  • 14successful releases of the Sanity Studio by completion

Since completion

The work did not stop

On 11 November, Add a card went live: editors can now add cards to a section on purpose, with a preview that follows the card.

3

how to videos, made from 13 short task clips, show the team how to edit content, manage user accounts and manage editors

Safeguards

Safe by design

14days

The database is backed up automatically and can be restored to a point in time within the last 14 days.

  • Each person can reach only their own records, and the database itself enforces it.
  • Information is encrypted on the way and where it is stored, including the database and its backups.
  • Sign in uses Google or a one time email code, so the Kete server never sees a password.
  • A person can export their records at any time. Delete everywhere removes the phone copy and the New Zealand copy at once, and backup copies age out within 14 days.
  • No advertising or analytics tools are in the app.

The road, date by date

  1. 20 AugustPrototype begins
  2. 11 SeptemberCatalyst database set up
  3. 14 SeptemberAgreed start
  4. 18 SeptemberHosting moves to AWS
  5. 16 OctoberFirst release on phones
  6. 19 OctoberPrismic tried, Sanity begun
  7. 20 OctoberFirst Studio release
  8. 25 OctoberDirectus removed
  9. 1 NovemberPractice restore
  10. 6 NovemberCompletion
  11. 11 NovemberAdd a card goes live

The whole picture

  • 53

    Days from the agreed start (14 September) to completion (6 November)

  • 52

    Days with work saved to the code

  • 41

    App screens

  • 232

    Reviewed change requests merged

  • 202,201

    Lines of working code at completion

  • 93,735

    Lines of automated tests at completion

  • Over 500 hours

    have gone into bringing this to life.

For every 10 lines written, about 3 were later taken out

The Directus studio, the Prismic trial, the Catalyst setup, and many first attempts that were replaced by better ones.

  • Lines written over the project423,946
  • Lines taken out120,832
  • Lines in the project at completion303,733

How we counted

  • Every number on this page was counted on 11 November 2026, from the code history, the build and test records, and the live content.
  • Unless a line says otherwise, the figures stop at completion on 6 November 2026.
  • Line counts are code lines only. Blank lines and comments are not counted.
  • The restore figures come from a practice run on the test copy of the system, not on live data.